For project inquiries, including environmental and social questions related to an IDB Invest investment, please contact the client or IDB Invest using the contact information provided above. As a last resort, affected communities have access to the IDB Invest Independent Consultation and Investigation Mechanism.
Tel:+1 (202) 623-3952
Fax: +1 (202) 312-4057
Address: 1300 New York Ave. NW Washington, DC. USA. 20577
E-mail: mecanismo@iadb.org or MICI@iadb.org

Project Number: 
CH3835A-01
Expected Consideration Date by the Board: 
09/23/2008
Date Posted: 
08/22/2008
Company: 
Empresas Coipsa S.A.
Financing Requested: 
Sector: 
Utilities
Location: 
San Francisco de Mostazal
Scope Objective: 
The Energía Pacífico S.A. project consists of building and operating a biomass cogeneration power plant to be located in San Francisco de Mostazal, in Chile’s Region VI (63 kilometers south of Santiago). With an installed capacity of 15.6 MW, the plant will be able to generate 131.5 GWh of clean power and 297,500 tons of steam per year. All of the steam and part of the power generated will be sold to Compañía Papelera del Pacífico S.A. (CPP), a shareholder of Energía Pacífico. The remainder will be sold to the central interconnected system. Commercial start-up of the plant is expected in the last quarter of 2009.

The company plans to seek greenhouse gas reduction certification and obtain carbon credits under the Clean Development Mechanism provisions of the United Nations Framework Convention on Climate Change.

With this operation, the IIC will be supporting the development of an electric power project in Chile by providing the long-term financing (up to twelve years) that such projects usually require. Chile’s burgeoning domestic demand, power generation shortfall, and dependence on imported fossil fuels indicate that its energy market fundamentals are sound and should encourage visionary companies such as Empresas Coipsa S.A. to invest in this sector in Chile.

Environmental Review: 
Classification. This is a category III project according to the IIC’s environmental review procedure because it could produce certain effects that may be avoided or mitigated by following generally recognized performance standards, guidelines, or design criteria. The main environmental and labor considerations related to the project are management of natural and water resources and liquid effluents, air emissions, solid waste, personal safety and emergency response, labor practices, and social and community affairs.

Natural Resource Management. The project will generate electrical energy from waste biomass, including forest waste (from timber plantations and sawmills), agribusiness waste (corn processing byproducts, fruit tree and vineyard pruning waste, fruit pits), industrial waste (discarded pallets and containers), and construction wood scraps. Much of this waste is currently burned in open fields. According to a study by Chile’s Comisión Nacional de Energía, the Instituto Forestal, and Germany’s international cooperation enterprise GTZ, biomass for generating energy is widely available. Studies carried out subsequently by the company confirmed this availability and determined that the supply of biomass far exceeds both current demand and projected demand for the coming years.

To ensure the volume, composition, and terms of the supply required for the project, Empresas Coipsa S.A. established TIRSA S.A., a company specializing in purchasing, processing, and delivering fuel for the cogeneration plant.

Management of Water Resources and Liquid Effluents. Water for the generation plant will be sourced from wells for which the company holds operating licenses because it will be located adjacent to the CPP plant.

Energía Pacífico will use CPP’s liquid effluent (LIW) plant, which has sufficient capacity to handle the effluents from both plants. Energía Pacífico’s main liquid effluents are boiler purges, which have no organic load, and wastewater from employee restrooms. CPP’s effluent treatment plant has a biological reactor with a twenty-day residence time followed by a clarifier. Treated effluents are discharged into a stream and comply with current regulations.

Air Emissions. The main air emissions come from burning biomass in the boiler. The boiler multicyclones will reduce the load of particulate matter to below authorized limits. To control the generation of potentially harmful combustion gases (NOx, SO2, and CO), the boiler will be able to use different fuels with varying moisture content. It will also have a sawdust burner to regulate boiler hearth gas heat and control gas composition. Diesel fuel may be added if necessary to achieve rapid caloric response and avoid excessive thermal range deviation.

Solid Waste Management. The main solid waste from plant operations is biomass combustion ash. The analyses carried out indicate that the chemical composition of this ash is not hazardous and that the ash can be used as a mineral additive for farmland.

Personal Safety and Emergency Response. Energía Pacífico will follow the same safety policies and procedures as CPP and the affiliates of Empresas Coipsa S.A., which include a yearly risk prevention and occupational safety plan. The companies have a joint management/employee committee charged with detecting, evaluating, and controlling risk.

Social and Community Affairs. Through its affiliates, Empresas Coipsa S.A. is actively involved in community education, recreation, and sports activities and liaises closely with civil society authorities and organizations. It also carries out recycling campaigns seeking to raise environmental awareness, invites schools to visit its facilities, supports sports clubs, and works with the San Francisco de Mostazal fire department. This corporate social responsibility policy will extend to Energía Pacífico as part of the same business group.

Monitoring and Reporting. Energía Pacífico shall develop an Environmental Management Plan (EMP) to ensure compliance with domestic regulations and the IIC’s environmental and workplace health and safety guidelines. The EMP shall provide for a yearly report on air emissions; liquid and solid waste management; health, occupational safety, and emergency response training; and accident reporting.